Fiber Optic Center will be at OFC - Schedule your meeting with a member of the FOC team now
CABLE PREP: Tips
To Locate “Transition Point” and Ensure It Is Sufficiently Encapsulated Within the Cured Epoxy
Ideally, the “transition point” will ultimately be located either just touching, or just behind (less than 1mm), the rear of the ceramic ferrule. It is an excellent practice to periodically take samples from the production line and cross-section them to look...
Read MoreWhen Even Stripped Fiber, Free of Damage, During Stripping and Handling Is Susceptible to Breaking
Even if the stripped fiber is kept free of damage during stripping and handling prior to inserting it into the ferrule, it is still very susceptible to breaking if it is not completely encapsulated in epoxy within the ferrule. All termination operators are familiar...
Read More